Caught (up) in traffic

Home » 2017 » January

Monthly Archives: January 2017

The other TNCs – Wunder and Angkas

The Land Transportation Franchising & Regulatory Board (LTFRB) recently issued a couple of press releases pertaining to two Transport Network Companies (TNCs). The issuances were for Wunder and Angkas to cease operations. Copies of the press releases were posted at the Department of Transportation (DOTr) Facebook page and are reproduced here:

16298690_831331103672694_3805426144684840894_n

16388281_831332637005874_4537041148404928979_n

Prior to these press releases, both Angkas and Wunder have been aggressively promoting themselves in social media. Wunder is the more established entity and is actually based in Germany. Its operations are basically carpooling and match drivers with passengers traveling about the same time and along their likely routes between homes and workplaces/schools.

Angkas appears to be a locally developed app. The big difference here though is that it is for motorcycle taxi services. While it is clear that tricycles (3-wheelers = usually a motorcycle plus a sidecar) used as public transportation are under the jurisdiction of local government units, their operations are governed by national laws. These include tricycles supposedly being banned from operating along national highways. Motorcycle taxis are regulated along the same lines with LGUs having the responsibilities over their operations (refer to my previous posts on habal-habal and Skylab) and are generally tolerated in rural areas where there is a lack of motorized transport services available. As far as the national government is concerned though, motorcycle taxis are prohibited and this is due primarily to safety concerns.

15825848_10154002589041805_6202129463622987124_n

I don’t know where Angkas gets the “professional motor taxi” tag since it is most likely that riders offering their services are not at all trained or experienced to provide public transport services and on a 2-wheeled vehicles. Such operations are risky especially to passengers. Even in countries like Thailand and Vietnam where motorcycle taxis are generally legal, it is established that such transport modes are unsafe with motorcycles being involved in more crashes compared to other vehicles. Motorcycles also have a higher fatality rate compared to other vehicles.

I think Wunder is different and could actually be closer to the classic (or conventional) carpooling idea compared to ridesharing/carsharing leaders Grab and Uber. Wunder clearly states that its aim is to maximize the available seats for the two likely trips people make with their vehicles. These two trips are usually one in the morning (i.e., to the workplace or to school) and another in the afternoon or evening (i.e., to home). As such, the income derived from Wunder is limited to the 2 trips although a driver can maximize income by accepting multiple passengers. In contrast, many (not all) Uber and Grab drivers in the Philippines operate practically the whole day and are basically taxis. I would recommend that the LTFRB look into the operations and business model of Wunder and perhaps reconsider their decision against it.

Where exactly will the Line 2 Extension stations be?

A good friend asked me about where the two additional stations of the Line 2 Extension will be. Most articles state that there will be a station at Masinag and at Emerald but since work on the stations has not commenced then many are still speculating on the final locations and how the station will be laid out with respect to the elevated tracks. However, if you look closely, you will see something like a hint to where the stations and their platforms will be laid out. Following are two photos; each showing features of the elevated tracks that taper off at what looks like the start and end points for the stations.

emerald-sta-l2Future Emerald Station in front of Robinsons Metro East?

masinag-sta-l2Future Masinag Station across SM City Masinag

Another observation and particularly at Masinag is how tall the structure seems to be. The platforms appear to be already at the 4th level if you compare the elevated tracks to the pedestrian overpass that represents the 2nd level. It seems that the Masinag Station will be quite a tall one and invites more questions from observers especially prospective and current users of Line 2. Perhaps it will be 4-storey building with commercial spaces for shops and restaurants? How massive will this structure be? Will there be a  connection with SM other than via the existing pedestrian overpass? How will the inter-modal needs be addressed by the station design? Will there be more parking or maybe park-and-ride facilities? Hopefully, these questions can be answered soon.

Updates on the Line 2 Extension: What’s next?

Marcos Highway is part of my regular commuting route and so I have been able to observe the progress of the construction of the elevated tracks for the extension of Line 2. The contractor, DMCI, is nearing the completion of their part of the project. Unfortunately, the stations and the electrical/power systems for the extension have not been bidded out by the DOTr and so there are not a few doubts whether the extension will be operational by 3rd quarter of 2017, which is the original completion date for the whole project. The construction of the two stations alone are expected to take some time and also will have a big impact on transport and traffic despite the construction sites being more concentrated around the stations at Emerald and Masinag. Here are a couple of photos showing what it looks like along Marcos Highway.

line-2-ext-17jan2017DMCI has almost completed clearing the stretch of Santolan to Masinag of their equipment. The barriers that delineated their work space are mostly gone, freeing up a lane each along either side of Marcos Highway. This has eased traffic along this major thoroughfare connecting Metro Manila to the east.

img_3823The pedestrian overpass across Vermont Royale has been retrofitted so the center section passes under the Line 2’s structure.

Timing is of the essence for the two additional stations of Line 2. As I said, the projected completion and start of operations was 3rd quarter of 2017. Of course, the last quarter of this year would still be most welcome but further delays mean more losses on the part of commuters and, overall, the government. Perhaps it was a mistake for the previous administration to have not included the stations in the package that DMCI eventually got and now has almost completed? Maybe the current administration should expedite the remaining parts of the Line 2 extension. This should prove how serious the current government is with its promises for better public transport (i.e., mass transport).

Updates and resolution on the common railway station in North-EDSA

The big news today is the agreement among the government and the big corporations involved in the issue of the common station at North Avenue-EDSA where three rail transit lines (Line 1, Line 3 and the future Line 7) will be converging. The key features of the agreement are reproduced here:

“KEY FEATURES OF AGREEMENT

  1. The Common Station has three components: (a) Area A, where the platform and concourse for LRT-1 and MRT-3 are located; (b) Area B, which consists of two Common Concourses connecting Area A and Area C; and (c) Area C, where the platform and concourse for MRT-7 is located.
  2. Area A will be financed and built by DOTr. Area B will be financed and built by Ayala and its partners (NTDCC) (this is Ayala’s contribution to the Common Station project). And Area C will be financed and built by San Miguel.
  3. The portion of Area A for LRT-1 will be operated, maintained, and developed by LRMC. The portion of Area A for MRT-3 will be operated, maintained, and developed by DOTr. Area B will be operated, maintained, and developed by Ayala. And Area C will be operated, maintained, and developed by San Miguel.
  4. The MOU contains the design parameters for the Common Station, which will be the basis of the Detailed Engineering Designs to be developed after signing of the MOU. The Detailed Engineering Designs will be completed within 240 calendar days from signing date.
  5. The designs shall ensure that a defined level of service is maintained at all times by all components of the Common Station.
  6. The designs shall ensure that all components of the Common Station are interconnected, and that SM City North EDSA and Trinoma are interconnected to the Common Station.
  7. The Common Station is targeted to be completed by 2 April 2019, subject to extension as may be justified under the MRT-7 Agreement with respect to Area C.
  8. SM’s TRO will be lifted soon after the Detailed Engineering Designs are completed.
  9. DPWH will build an underpass along EDSA at the area where the Common Station will be constructed. This will be financed and built by DPWH.”

That was a direct copy and paste from the DOTr’s Facebook page.

There is another piece of information that’s gained a popular following and that is the design for the common station that was shared to the public:

Proposed design of the common station

I think the design is basically okay in terms of location. The layout would need to be refined in order to address concerns pertaining to optimum and efficient transfer of passengers between lines. I assume from the drawings that all three lines will be at the same level but with a plaza separating Lines 1 &3 from Line 7. There are also issues pertaining to proposed road grade separation in the area but that seems to have been addressed already by item #9 in the preceding list. We can only hope that the current government and private sector partnership can expedite this project.

Commuting and stress

Here is another quick post but on a topic that’s related to health and therefore is something that I think many should be interested in and perhaps take important note of.

Commuting: “The Stress that Doesn’t Pay”

There are many links to various medical articles within the article. At the last part, there is also a list of references that the reader may want to look at. I’m also posting this for future reference. This would contribute to the formulation of topics for research especially the inter-disciplinary or collaborative kind.

Motorcycles as goods transport

Our study on motorcycle taxis revealed most if not all of these “habal-habal” and “Skylab” being used to transport goods as well. These include agricultural products, food, construction materials, fuel, poultry, and others you would not see your typical courier service motorcycles will carry.

[All photos courtesy of Mr. Sherman Avendano of the National Center for Transportation Studies]

agusan-5A motorcycle bearing what appears as goods for or from the market treading a muddy and puddle-full road.

agusan-6Motorcycle transporting what looks more like lumber than firewood.

agusan-7Skylab carrying what looks like 4 sacks of rice.

I was gifted by my wife with a coffee table book she got from one of her trips to Vietnam. The book contains photos of motorcycles in Vietnam being used to transport various goods including furniture, water bottles, crafts and even items like tractor tires, water tanks and roofing. I guess one can also compile a similar set of photos to come up with a Philippine version of that book.

Kennon Road – Some photos taken in June 2016

I had not been to Baguio City for quite some time until June of 2016 (last year). And so I took a lot of photos of the roads between Metro Manila and Baguio including the three expressways (NLEX, SCTEX and TPLEX) and Marcos Highway. I have only posted photos of Marcos Highway ( a lot of them) and haven’t come to downloading photos of TPLEX that I have taken during my first time along the entire stretch at the time. To sort of make up for the backlog, I am posting the following photos of Kennon Road that I took almost 7 months ago. I assume most if not all roadworks along Kennon Road that some of the following photos show are already completed. I will no longer write captions for each of the photos but there are many landmarks shown here that can help the reader in his/her sense of direction and orientation. The following photos are of Kennon Road from Rosario, La Union to Baguio.

2016-06-09 11.07.43

2016-06-09 11.23.40

2016-06-09 11.24.50

2016-06-09 11.25.45

2016-06-09 11.26.33

2016-06-09 11.27.12

2016-06-09 11.28.15

2016-06-09 11.28.48

2016-06-09 11.29.09

2016-06-09 11.33.03

2016-06-09 11.33.16

2016-06-09 11.34.24

2016-06-09 11.35.18

2016-06-09 11.36.22 2016-06-09 11.36.46

2016-06-09 11.38.03

2016-06-09 11.38.04

2016-06-09 11.38.27

2016-06-09 11.38.48

2016-06-09 11.40.49

2016-06-09 11.42.01

2016-06-09 11.44.06

2016-06-09 11.44.18

2016-06-09 11.44.25

2016-06-09 11.44.37

2016-06-09 11.45.32

2016-06-09 11.46.08

2016-06-09 11.46.26 2016-06-09 11.46.34

2016-06-09 11.46.51

2016-06-09 11.46.56

2016-06-09 11.49.10

2016-06-09 11.51.26

2016-06-09 11.52.28

2016-06-09 11.52.31

2016-06-09 11.53.44

2016-06-09 11.53.55 2016-06-09 11.54.31

2016-06-09 11.57.05

2016-06-09 11.57.37

2016-06-09 12.07.22

2016-06-09 12.07.31

2016-06-09 12.08.09

2016-06-09 12.09.02

2016-06-09 12.09.49

2016-06-09 12.09.56

2016-06-09 12.10.17

2016-06-09 12.10.28

2016-06-09 12.11.42

2016-06-09 12.21.51

2016-06-09 12.22.03

2016-06-09 12.22.27

More photos from that June 2016 trip soon…