Caught (up) in traffic

Home » 2017 (Page 12)

Yearly Archives: 2017

Revisiting Daang Bakal, Antipolo

In a recent trip to a school located near Daang Bakal, I took the opportunity to ask my passenger to take photos of what used to be a railway corridor connecting Manila with Antipolo.

img_3945Section before the Victoria Valley gate (view away from the gate) along which is a community

img_3946

img_3947

img_3948

img_3949One side of the road has been widened. The other has a lot of trees that would have to be cut or balled in order to build an additional lane.

img_3950Widened section towards the Parish of the Immaculate Heart of Mary

img_3951Section across the Parish of the Immaculate Heart of Mary

img_3952

img_3953Skateboarders 

img_3954Power and light posts are yet to be relocated away and clear of the carriageway after the road was widened

img_3955Many electric posts need to be relocated as they pose dangers to road users

img_3956Section towards Hinulugang Taktak gate – the fence on the left is to secure the national park’s grounds from informal settlers

img_3957Section across Hinulugang Taktak gate

One can only imagine how these places looked like many years ago when the Manila Railroad Company operated the Antipolo Line.

On transport, technology and politics

I frequently share articles I found to be interesting and intriguing. One of my current research interests is on ridesharing, ridesourcing and carpooling. And so when I saw this article online, I felt it had some good arguments pertaining to ridesharing considering these are all claiming to be

Transport isn’t technology, it’s politics

The article is by Konstantinos Dimopoulos and appeared on How We Get to Next last February 17, 2017.

ITS Forum 2017 at DLSU

We are holding a forum on Intelligent Transport Systems (ITS) today at the De La Salle University (DLSU) along Taft Avenue, Manila. Following is the banner and the program as of February 16:

its-forum-2017-bannerfinal_program_its_asof_feb16In the workshops scheduled in the afternoon, the plan is to review the DOST roadmap and the ITS Master Plan. The DOST roadmap is basically on the research and development agenda of the agency. In the past, this has been associated mainly with the Engineering Research and Development for Technology (ERDT) program of which several major universities are a part of including UP Diliman, DLSU, Ateneo and Mapua Institute of Technology. Eventually, ITS became the theme for other R&D including those that were packaged as ITS but not necessarily falls under the category (i.e., projects like the AGT, hybrid bus and bike share are more sustainable transport than ITS).

The ITS Master Plan is actually something developed under a project implemented through the Department of Public Works and Highways (DPWH) more than 6 years ago and originally only for Metro Manila. This plan is being eyed as the foundation for a bigger one that hopefully would apply to the rest of the country.

Addressing concerns about hazardous work-sites along Sumulong Highway

The concern about hazardous worksites along Sumulong Highway that I wrote about earlier this week has apparently been addressed. Here are a few photos of those areas and prominent in the photos are the concrete barriers set up by the contractor with “DPWH” painted on each barrier. These are the same barriers that they mass-produced and were just sitting in the project office nearby and not utilized until very, very recently.

img_3966

img_3965

img_3964

While these areas still pose significant risks to road users. These are not a continuous barrier with only yellow tape connecting them, and people and vehicles can still easily get through between the gaps. Yet, these will do (for now) and is better than nothing. Perhaps, though, the DPWH and LGUs like Antipolo City can do a better effort to compel contractors to improve safety in work sites like this in order to minimize the likelihood of crashes or accidents.

Opposition to C-6

There had been no significant developments for the Circumferential Road 6 (C-6) not counting the road widening and concreting along the sections at Lupang Arenda in Taytay, Rizal. Meanwhile along its lakeside alignment in Taguig, a 2-lane road has been constructed apparently as part of the widening of the section for what maybe a future 4-lane road with a median island dividing opposing flows of traffic.

img_3866Sign apparently put up by this residential subdivision’s homeowners’ association

img_3865Close-up of the sign shows opposition by the residents to the proposed C6 alignment to pass through their homes.

I haven’t heard or read about anything new or updates about C-6. It seems to be tied to other projects including a proposed elevated tollway along the shores of the Laguna de Bay. The alignment though to the north seem to be unresolved and will definitely be a big concern for many developed residential areas including those in the Province of Rizal.

Special lectures on transport – February 23, 2017

I just wanted to share the following announcement from the University of the Philippines Diliman about special lectures on transport. The lectures will be delivered at the Melchor Hall theater at the UP Diliman campus and is open to the public.

unnamed

Hazardous worksites along Sumulong Highway

There are hazardous worksites along Sumulong Highway. These are related to current drainage works and construction of pedestrian facilities (sidewalks) along the highway. Travelers can see the steel reinforcing bars (rebars) sticking out and posing risks to road users. Following are some photos we took as we traversed the stretch near La Montana, Palos Verdes and Cavaliers Village.

img_3872Highway drainage works along Sumulong Highway

img_3873Steel reinforcing bars sticking out of the drainage works along the Masinag-bound side of Sumulong Highway.

img_3878More hazardous worksites

img_3879Unmanned and unfinished worksite along Sumulong Highway. Pedestrians, cyclists and motorcyclists seem unfazed by the hazard posed by the rebars.

These pose dangers to most road users and especially motorcyclists and cyclists who may experience a spill that can lead to riders being impaled by the rebars. The contractor definitely is violating safety codes in as far as construction sites are concerned and these are in plain view of the public. The DPWH as well as the local government of Antipolo City should act immediately and decisively in order to prevent untoward incidents concerning such worksites. There should be measures such as physical barriers that would protect road users against such hazards. There are currently none.

Habal-habal and skylab in Surigao Del Sur

Following are more examples of motorcycle taxis from our recent study. The photos were taken at a terminal in a town in Surigao Del Sur. Both habal-habal and Skylab were there waiting for passengers to transport to the barrios.

surigao-4Skylab with roof integrated with the extensions

surigao-3Habal-habal with makeshift roof

surigao-2Haba-habal and skylab at terminal in Tandag, Surigao De Sur

surigao-1More motorcycle taxis at the terminal

Note that many have roofs and these appear to be especially fabricated for either type of vehicle. In the case of the Skylab, the roof is connected to the extensions on either side of the motorcycle similar to how sidecars of motorized tricycles are fabricated to integrate a roof for the driver. While there are similar set-ups for habal-habal, many are more makeshift where the canvass roof’s columns are made of wood or even bamboo and are tied to the motorcycle.

The other TNCs – Wunder and Angkas

The Land Transportation Franchising & Regulatory Board (LTFRB) recently issued a couple of press releases pertaining to two Transport Network Companies (TNCs). The issuances were for Wunder and Angkas to cease operations. Copies of the press releases were posted at the Department of Transportation (DOTr) Facebook page and are reproduced here:

16298690_831331103672694_3805426144684840894_n

16388281_831332637005874_4537041148404928979_n

Prior to these press releases, both Angkas and Wunder have been aggressively promoting themselves in social media. Wunder is the more established entity and is actually based in Germany. Its operations are basically carpooling and match drivers with passengers traveling about the same time and along their likely routes between homes and workplaces/schools.

Angkas appears to be a locally developed app. The big difference here though is that it is for motorcycle taxi services. While it is clear that tricycles (3-wheelers = usually a motorcycle plus a sidecar) used as public transportation are under the jurisdiction of local government units, their operations are governed by national laws. These include tricycles supposedly being banned from operating along national highways. Motorcycle taxis are regulated along the same lines with LGUs having the responsibilities over their operations (refer to my previous posts on habal-habal and Skylab) and are generally tolerated in rural areas where there is a lack of motorized transport services available. As far as the national government is concerned though, motorcycle taxis are prohibited and this is due primarily to safety concerns.

15825848_10154002589041805_6202129463622987124_n

I don’t know where Angkas gets the “professional motor taxi” tag since it is most likely that riders offering their services are not at all trained or experienced to provide public transport services and on a 2-wheeled vehicles. Such operations are risky especially to passengers. Even in countries like Thailand and Vietnam where motorcycle taxis are generally legal, it is established that such transport modes are unsafe with motorcycles being involved in more crashes compared to other vehicles. Motorcycles also have a higher fatality rate compared to other vehicles.

I think Wunder is different and could actually be closer to the classic (or conventional) carpooling idea compared to ridesharing/carsharing leaders Grab and Uber. Wunder clearly states that its aim is to maximize the available seats for the two likely trips people make with their vehicles. These two trips are usually one in the morning (i.e., to the workplace or to school) and another in the afternoon or evening (i.e., to home). As such, the income derived from Wunder is limited to the 2 trips although a driver can maximize income by accepting multiple passengers. In contrast, many (not all) Uber and Grab drivers in the Philippines operate practically the whole day and are basically taxis. I would recommend that the LTFRB look into the operations and business model of Wunder and perhaps reconsider their decision against it.

Where exactly will the Line 2 Extension stations be?

A good friend asked me about where the two additional stations of the Line 2 Extension will be. Most articles state that there will be a station at Masinag and at Emerald but since work on the stations has not commenced then many are still speculating on the final locations and how the station will be laid out with respect to the elevated tracks. However, if you look closely, you will see something like a hint to where the stations and their platforms will be laid out. Following are two photos; each showing features of the elevated tracks that taper off at what looks like the start and end points for the stations.

emerald-sta-l2Future Emerald Station in front of Robinsons Metro East?

masinag-sta-l2Future Masinag Station across SM City Masinag

Another observation and particularly at Masinag is how tall the structure seems to be. The platforms appear to be already at the 4th level if you compare the elevated tracks to the pedestrian overpass that represents the 2nd level. It seems that the Masinag Station will be quite a tall one and invites more questions from observers especially prospective and current users of Line 2. Perhaps it will be 4-storey building with commercial spaces for shops and restaurants? How massive will this structure be? Will there be a  connection with SM other than via the existing pedestrian overpass? How will the inter-modal needs be addressed by the station design? Will there be more parking or maybe park-and-ride facilities? Hopefully, these questions can be answered soon.